Project Profile

Hill Canyon Treatment Plant Network and SCADA Upgrade

Thousand Oaks, California

The City of Thousand Oaks modernized the controls at its active Hill Canyon Wastewater Treatment Plant to replace obsolete PLC hardware, support future expansion, and create a more cohesive controls environment. Serving as prime contractor and systems integrator, TSI migrated the plant from legacy Rockwell SLC controls and Wonderware HMI software to a Rockwell PlantPAx system, replacing 17 SLC 5/05 CPUs with CompactLogix processors while integrating the plant’s existing I/O infrastructure.

The City of Thousand Oaks was operating the Hill Canyon Wastewater Treatment Plant on aging Rockwell SLC processors that were becoming obsolete and limiting the City’s ability to expand the system. At the same time, the City wanted to move away from its existing Wonderware HMI environment and create a more cohesive controls platform using Rockwell PlantPAx. 

The modernization needed to address 17 Rockwell SLC 5/05 CPUs along with the plant’s SCADA/HMI, networking, computer, and server infrastructure. Rather than replacing the existing I/O infrastructure outright, the project called for the SLC I/O racks to be converted to remote I/O supporting new CompactLogix CPUs.

Complicating the migration, Hill Canyon remained an active wastewater treatment plant throughout the project. TSI therefore needed to coordinate cutovers closely with plant operations while avoiding unplanned interruptions to treatment operations.

As prime contractor and systems integrator, TSI migrated Hill Canyon from its legacy Wonderware and SLC-based controls environment to a Rockwell PlantPAx system while modernizing the underlying PLC architecture.

TSI replaced 17 Rockwell SLC 5/05 CPUs with CompactLogix processors and converted the existing SLC I/O racks to remote I/O for the new CPUs. TSI also provided the control panel hardware, networking equipment, and computer and server hardware and software required for the upgrade. Throughout implementation, TSI coordinated closely with plant operations to manage the controls cutover while the treatment plant remained active.

 

Our solution included:

  • SCADA & HMI Modernization — Migrated the plant from its existing Wonderware environment to a Rockwell PlantPAx system.
  • PLC Modernization — Replaced 17 Rockwell SLC 5/05 CPUs with Rockwell CompactLogix CPUs.
  • Existing I/O Integration — Converted the existing SLC I/O racks to remote I/O supporting the new CompactLogix processors.
  • Controls Hardware — Provided control panel hardware for the upgraded system.
  • Network & Server Infrastructure — Provided networking equipment along with the computer and server hardware and software supporting the new system.
  • Operational Cutover — Coordinated implementation with plant operations to complete the modernization at an active wastewater treatment facility without unplanned outages.

The completed modernization replaced Hill Canyon’s obsolete SLC controls and legacy Wonderware environment with a more cohesive PlantPAx-based system designed to better support future expansion. By integrating the plant’s existing I/O infrastructure into the new architecture, TSI modernized the core controls platform while making use of viable existing equipment. Careful coordination with plant operations also allowed the migration to move forward while the treatment facility remained active, with no unplanned outages during the controls cutover.

At a Glance

Client

City of Thousand Oaks

Industry

Wastewater Utilities

Location

Thousand Oaks, California

Contract Value

$1,700,000.00

TSI Services

  • Prime Contracting
  • Systems Integration
  • SCADA & HMI Upgrades
  • Controls Engineering
  • Hardware Integration
  • Network Infrastructure
  • Computer & Server Integration

Technologies

  • Rockwell Software PlantPAx
  • Rockwell SLC 5/05
  • Rockwell CompactLogix
  • Remote I/O

Project Statistics

17

SLC 5/05 CPUs Replaced

17

CompactLogix CPUs Installed