  • Project Name: West Point Treatment Plant
  • Market: Municipal
  • Region: Washington
  • Capabilities:
    • Systems Integration

Seattle King County/Metro, West Point Treatment Plant Secondary Treatment/Renovation Project

Seattle, Washington – TSI was involved in the integration, programming and panel fabrication (80 control panels) of the Liquids/Solids/Renovation phases of the completed West Point Secondary WWTP Expansion. Part of a very large, multi-phase project, the Liquids and Solids phases was particularly challenging because it involved multiple contracts with multiple contractors. On a large 440 MGD plant, a detailed understanding of the plant, its operation as well as the control system needs was required. The project required extensive planning and communications with plant operators to insure uninterrupted plant start-up and training. Programmable Logic Controllers (TI/Siemens PLC’s) were connected to a very large in-plant SCADA communications system.

Type of Contract: Sub-Contracts with General Contractors and Electrical Contractors

Contract Amount: $7,000,000 (Total)