The City of Tacoma undertook a large-scale process controls modernization across two operating wastewater treatment plants, replacing the existing ABB DCS with Rockwell PlantPAx. Selected through an evaluated procurement process, TSI served as both prime contractor and systems integrator, providing a single point of responsibility for the controls migration while coordinating process-area cutovers around ongoing plant operations.
The City of Tacoma needed to replace its existing ABB distributed control system across two operating wastewater treatment plants with a new Rockwell PlantPAx platform. This was not an isolated PLC upgrade; it was a large-scale migration encompassing process controls throughout two active treatment facilities, including 22 PLC control panels, 32 Remote I/O panels, 27 existing vendor control panels, and more than 100 new instruments.
Because both plants needed to remain operational, cutover planning and coordination were critical. Each process area had to be transitioned from the existing DCS to the new PlantPAx environment in a planned sequence, requiring close coordination with City staff and careful integration of new controls, instrumentation, Remote I/O, and existing vendor equipment.
As prime contractor and systems integrator, TSI took responsibility for a broad controls scope spanning panel fabrication and installation, programming, instrumentation, vendor-system integration, cutover coordination, startup, and commissioning. This structure gave the City a single controls partner responsible for coordinating the many moving pieces involved in migrating two operating wastewater treatment plants from ABB DCS to Rockwell PlantPAx.
TSI worked closely with City staff to sequence the migration by process area, allowing portions of the new PlantPAx system to be brought online as the plants continued operating. The new architecture incorporated 22 PLC control panels, 32 Remote I/O panels, 27 existing vendor control panels, and more than 100 new instruments.
Our solution included:
The completed modernization transitioned process controls across two active wastewater treatment plants from the legacy ABB DCS to a modern PlantPAx architecture while maintaining plant operations throughout the migration. Through careful coordination with City staff, TSI sequenced process-area cutovers to bring the new PLC controls, Remote I/O, instrumentation, and existing vendor systems together within the upgraded environment. Serving as both prime contractor and systems integrator provided continuity across the complex migration and a single point of responsibility for the controls scope.