As part of the Los Osos Water Recycling Facility project, TSI provided hardware and software integration for a new Allen-Bradley PLC and AVEVA Wonderware SCADA system. Working as a subcontractor to Auburn Constructors, TSI fabricated control panels, supplied field instrumentation, programmed the new system, and integrated 25 remote water sites into the plant SCADA environment.
The Los Osos Water Recycling Facility project required a new controls architecture that extended beyond the treatment facility itself. In addition to installing a new Allen-Bradley PLC and Wonderware SCADA system at the plant, the project needed to bring 25 remote water sites into the same SCADA environment.
That created a broad integration scope spanning plant controls, dozens of local control panels, field instrumentation, and geographically distributed remote sites.
Working as a subcontractor to Auburn Constructors, TSI provided the hardware and software integration for the facility’s new control system. TSI fabricated two main control panels and 50 local control panels, performed programming, supplied field instrumentation, and integrated the remote water sites into the plant SCADA system.
Our solution included:
Coming Soon