Faced with aging PLCs and the need to future-proof its controls infrastructure for greater security and future expansion, the City of Oceanside undertook a major SCADA modernization spanning three treatment plants, 35 wastewater collection sites, and 29 water distribution sites. Serving as prime contractor and systems integrator, TSI replaced existing Modicon PLCs with Schneider Electric Modicon M340 PLCs, upgraded more than 100 control panels, and implemented a new AVEVA Wonderware System Platform SCADA system across the City’s distributed water and wastewater infrastructure.
The City of Oceanside was operating a large, geographically distributed control system supporting both its water and wastewater infrastructure. With existing PLCs becoming obsolete, the City needed to modernize its controls environment to improve long-term supportability while future-proofing the system for greater security and continued expansion.
The scale of the modernization added another layer of complexity. The project encompassed three treatment plants, 35 wastewater collection sites, and 29 water distribution sites, with more than 100 control panels included in the upgrade. Executing a modernization across such a broad network required coordinating PLC, SCADA, instrumentation, radio communications, panel, and field work across treatment facilities and dozens of remote locations.
As prime contractor and systems integrator, TSI took responsibility for managing the controls modernization across the City’s distributed water and wastewater infrastructure. Existing Modicon PLCs were replaced with Schneider Electric Modicon M340 PLCs, more than 100 control panels were redesigned and upgraded, and a new SCADA environment was implemented using AVEVA Wonderware System Platform.
TSI’s field services extended through system verification and operator handoff, including electrical subcontractor coordination, instrument setup and calibration, radio communications configuration and testing, I/O testing, loop check verification, functional testing, and onsite training.
Our solution included:
The completed modernization replaced aging controls across Oceanside’s extensive water and wastewater infrastructure with a more supportable platform positioned for improved security and future expansion. By serving as both prime contractor and systems integrator, TSI provided continuity across the PLC, SCADA, panel, instrumentation, communications, testing, and training scopes of the project. The successful project also grew into a long-term relationship: TSI now serves as the City of Oceanside’s full-service, on-call systems integrator, continuing to support the City as its controls needs evolve.